With an installed power of 2.1 MW, these solar panels can ‘self-produce’ approximately 50% of electricity requirements at the main site in via Selice Provinciale 17A. Paolo Mongardi, President of SACMI, states: “This project is a big step forwards in the strategy of boosting our companies’ environmental performance”